** warning ** warning ** warning ** warning ** · pdf file · 2006-04-03** warning...

161
** WARNING ** WARNING ** WARNING ** WARNING ** This document is intended for informational purposes only. Users are cautioned that California Department of Transportation (Department) does not assume any liability or responsibility based on these electronic files or for any defective or incomplete copying, exerpting, scanning, faxing or downloading of the contract documents. As always, for the official paper versions of the bidders packages and non-bidder packages, including addenda write to the California Department of Transportation, Plans and Bid Documents, Room 0200, P.O. Box 942874, Sacramento, CA 94272-0001, telephone (916) 654-4490 or fax (916) 654-7028. Office hours are 7:30 a.m. to 4:15 p.m. When ordering bidder or non-bidder packages it is important that you include a telephone number and fax number, P.O. Box and street address so that you can receive addenda.

Upload: buianh

Post on 14-Mar-2018

311 views

Category:

Documents


3 download

TRANSCRIPT

  • ** WARNING ** WARNING ** WARNING ** WARNING **This document is intended for informational purposes only.

    Users are cautioned that California Department of Transportation (Department) does not assume any liability orresponsibility based on these electronic files or for any defective or incomplete copying, exerpting, scanning, faxing ordownloading of the contract documents. As always, for the official paper versions of the bidders packages and non-bidderpackages, including addenda write to the California Department of Transportation, Plans and Bid Documents, Room 0200,P.O. Box 942874, Sacramento, CA 94272-0001, telephone (916) 654-4490 or fax (916) 654-7028. Office hours are 7:30 a.m.to 4:15 p.m. When ordering bidder or non-bidder packages it is important that you include a telephone number and faxnumber, P.O. Box and street address so that you can receive addenda.

  • etric

    Caltrans

    STATE OF CALIFORNIA

    DEPARTMENT OF TRANSPORTATION__________________________________________________________

    NOTICE TO CONTRACTORSAND

    SPECIAL PROVISIONSFOR CONSTRUCTION ON STATE HIGHWAY IN

    LOS ANGELES COUNTY AT FERNWOOD

    FROM 0.1 KM SOUTH OF CUESTA CALA ROAD TO TOPANGA SCHOOL ROAD

    DISTRICT 07, ROUTE 27

    __________________________________________________________

    For Use in Connection with Standard Specifications Dated JULY 1999, Standard Plans Dated JULY 2004, and LaborSurcharge and Equipment Rental Rates.

    __________________________________________________________

    CONTRACT NO. 07-0P6804

    07-LA-27-6.7/7.4

    Bids Open: May 11, 2006 AADDDated: April 3, 2006

  • *************************************************************************************************

    IMPORTANTSPECIAL NOTICES

    *************************************************************************************************

    Attention is directed to "Guarantee" of Section 5 of the special provisions regarding the Contractor's guarantee ofcontract work.

  • Contract No. 07-0P6804i

    TABLE OF CONTENTS

    NOTICE TO CONTRACTORS ...........................................................................................................................................1COPY OF ENGINEER'S ESTIMATE .................................................................................................................................3SPECIAL PROVISIONS......................................................................................................................................................5SECTION 1. SPECIFICATIONS AND PLANS.................................................................................................................5AMENDMENTS TO JULY 1999 STANDARD SPECIFICATIONS .................................................................................5SECTION 2. PROPOSAL REQUIREMENTS AND CONDITIONS...............................................................................75

    2-1.01 GENERAL ......................................................................................................................................................752-1.02 DISABLED VETERAN BUSINESS ENTERPRISE (DVBE).......................................................................762-1.03 DVBE GOAL FOR THIS PROJECT..............................................................................................................772-1.04 SUBMISSION OF DVBE INFORMATION ..................................................................................................772-1.05 SMALL BUSINESS PREFERENCE..............................................................................................................782-1.06 CALIFORNIA COMPANY PREFERENCE..................................................................................................78

    SECTION 3. AWARD AND EXECUTION OF CONTRACT.........................................................................................79SECTION 4. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES ........................80SECTION 5. GENERAL...................................................................................................................................................80SECTION 5-1. MISCELLANEOUS.................................................................................................................................80

    5-1.01 PLANS AND WORKING DRAWINGS........................................................................................................805-1.013 LINES AND GRADES.................................................................................................................................805-1.015 LABORATORY............................................................................................................................................805-1.017 CONTRACT BONDS...................................................................................................................................805-1.018 GUARANTEE ..............................................................................................................................................805-1.019 COST REDUCTION INCENTIVE ..............................................................................................................815-1.02 LABOR NONDISCRIMINATION.................................................................................................................825-1.022 PAYMENT OF WITHHELD FUNDS..........................................................................................................825-1.03 INTEREST ON PAYMENTS.........................................................................................................................825-1.04 PUBLIC SAFETY...........................................................................................................................................825-1.05 TESTING ........................................................................................................................................................835-1.06 REMOVAL OF ASBESTOS AND HAZARDOUS SUBSTANCES.............................................................835-1.065 SOLID WASTE DISPOSAL AND RECYCLING REPORT.......................................................................845-1.07 (BLANK) ........................................................................................................................................................845-1.08 SUBCONTRACTOR AND DVBE RECORDS .............................................................................................845-1.086 PERFORMANCE OF DVBE SUBCONTRACTORS AND SUPPLIERS...................................................845-1.09 SUBCONTRACTING.....................................................................................................................................855-1.10 PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS ...................................................................855-1.103 RECORDS ....................................................................................................................................................855-1.104 INTERNET DAILY EXTRA WORK REPORT ..........................................................................................865-1.11 COMPENSATION ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS ...........................................865-1.12 AREAS FOR CONTRACTOR'S USE............................................................................................................875-1.13 PAYMENTS ...................................................................................................................................................875-1.14 PROJECT INFORMATION ...........................................................................................................................875-1.15 SOUND CONTROL REQUIREMENTS........................................................................................................88

    SECTION 6. (BLANK) .....................................................................................................................................................88SECTION 7. (BLANK) .....................................................................................................................................................88SECTION 8. MATERIALS...............................................................................................................................................88SECTION 8-1. MISCELLANEOUS.................................................................................................................................88

    8-1.01 SUBSTITUTION OF NON-METRIC MATERIALS AND PRODUCTS .....................................................888-1.02 PREQUALIFIED AND TESTED SIGNING AND DELINEATION MATERIALS.....................................958-1.03 STATE-FURNISHED MATERIALS ...........................................................................................................1018-1.04 SLAG AGGREGATE ...................................................................................................................................101

    SECTION 8-2. CONCRETE ...........................................................................................................................................1028-2.01 PORTLAND CEMENT CONCRETE ..........................................................................................................102

    SECTION 8-3. WELDING..............................................................................................................................................1038-3.01 WELDING ....................................................................................................................................................103

    GENERAL ......................................