Page 1: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Analyze the Resource Inventory

Page 2: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Calculate Flow Requirements

• System capacity formula

Page 3: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Basic form

QT=AD

– Q = flow rate (cfs)– T = time (hrs)– A = area (ac)– D = depth (in)

Page 4: © Irrigation Association Analyze the Resource Inventory

Let’s look at the manual for calculation

of GIR

Page 5: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Etc is the average daily ET

• For shallow rooted crops use 5 day period

• For medium rooted crops use 10 day period

• For deep rooted crops use 20 day period

• For sandy soils these values are halved– Example: beans are medium rooted

crop 10 days /2 = 5 days period

Page 6: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

ET During Growing Season

May

June

July

August

Septe

mber

0.00

0.10

0.20

0.30

0.40

Cro

p E

T (

in/d

ay

)Wheat Corn Soybean

Page 7: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Daily ET graph

1234567891011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556575859606162636465666768697071727374757677787980818283848586878889909192939495969798991001011021031041051061071081091101111121131141151161171181191201211221231241251261271281291301311321331341351361371381391401411421431441451461471481491501511521531541551561571581591601611621631641651661671681691701711721731741751761771781791801811821831841851861871881891901911921931941951961971981992002012022032042052062072082090

0.1

0.2

0.3

0.4

0.5

Alfalfa

Growing Day

ET

(in

/da

y)

Page 8: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Adjustment Factor for frequency of wetting

• kf

Page 9: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Page 10: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Calculate Irrigation Frequency

• Maximum is related to MAD x AW x RZ

• Precipitation reservoir• Safety buffer for downtime• Balancing frequent irrigations,

intake rates and reserve storage

Page 11: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Suggested starting intervals

• 2.5 days for sandier soils• 3.5 to 4.5 days for medium

textured soils• See Appendix G for more

information

Page 12: © Irrigation Association Analyze the Resource Inventory

Let’s look at the manual for calculation

of Qs

Page 13: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Fraction of time operated

• t =the fraction of time that the system is turned on for a typical day during the peak period.

• Often in design, t = 0.9 is used to account for some down time.

Page 14: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Limited water supply

• Limits on water– Insufficient water rights– Inadequate well or pump capacity– Limited seasonal water supply

Page 15: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Deficit Irrigation

• What is the responsibility of the designer?

Page 16: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

0 5 10 15 20 25 300

50

100

150

200Wheat Soybean Corn

Evapotranspiration (inches)

Yie

ld (

bu

/ac)

Yield vs Evapotranspiration

Page 17: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Practice Session #1 - Calculating the design flow

rate

Page 18: © Irrigation Association Analyze the Resource Inventory

© Irrigation Association

Practice Session #2 - Design project flow rate